Page 1 of 3

New Lab Fit Up

Posted: Mon May 01, 2023 2:56 pm
by MED6753
The first installment which will be a long process of fitting up the new lab.

Contained within this pile is bench 2 and the bottom half of bench 1. Bench 2 will be built up first and occupy this space. Bench 1 will then be built up but unlike the old lab the two benches will not be joined together in an "L" like the old lab. Once the initial layout is done I'll post up pictures.

After those 2 benches are built up I'll be tossing equipment on them temporarily just to give me more room to work. There is stuff scattered all over which will take time to organize.

Image
Image

Re: New Lab Fit Up

Posted: Mon May 01, 2023 6:35 pm
by BU508A
I'm missing the pink curtains.

:D

Re: New Lab Fit Up

Posted: Mon May 01, 2023 7:47 pm
by mnementh
Damn. Mounty beat me to it. :rofl:

mnem
Image

Re: New Lab Fit Up

Posted: Mon May 01, 2023 11:09 pm
by MED6753
BU508A wrote: Mon May 01, 2023 6:35 pm I'm missing the pink curtains.

:D

Image

Re: New Lab Fit Up

Posted: Tue May 02, 2023 12:54 am
by Specmaster
Now those are proper pink for sure this time :lol: :lol: :lol:

Re: New Lab Fit Up

Posted: Tue May 02, 2023 4:39 am
by tautech
The title Fit Up sounds ominous whereas just Build sounds much better. :D
Hoping it's goes like clockwork for you Mike.

Re: New Lab Fit Up

Posted: Tue May 02, 2023 1:56 pm
by MED6753
Some progress today but had to quit to get other things done.

Bench 2 is now assembled.

Image

That small shelf unit is in place allowing a gap from it to bench 2. I have future plans to expand the width of bench 2 after the majority of the lab is done.

Image

To the left of that small shelf unit are pieces of bench 1 which will be placed there. I hope to have it assembled tomorrow.

Image

And the first incident of damage. A drawer fell on a Tek 475A completely destroying the Trigger Level Switch/Pot. I think I have a replacement in my parts stash. :(

Re: New Lab Fit Up

Posted: Tue May 02, 2023 2:15 pm
by Specmaster
Looking good Mike, bleeding shame though about the Tek 475A, still, look at this way, you now have a patient ready for the bench once its all completed ;)

Re: New Lab Fit Up

Posted: Tue May 02, 2023 3:01 pm
by MED6753
Falls under the category of "shit happens". :x Once I get bench 1 assembled I should be able to get most, if not all, the TE off the floor to prevent any further accidents.

Re: New Lab Fit Up

Posted: Tue May 02, 2023 11:02 pm
by mnementh
As muh grand-dad said to me many, many times... "If that's the worst that happens tooya before bedtime, it's been a damn fine day."

Enjoy your build... and your rebuild. ;)

mnem
*toddles off to scorch some leftover pizza*

Re: New Lab Fit Up

Posted: Wed May 03, 2023 3:59 pm
by MED6753
Today's activity.

Got some TE off the floor to give much needed room to work. Did a quick power test of each piece and they survived the move.

Image

Bench 1 assembled before installation of upper shelf assembly. Took over 2 hours to get it to that point.

Image

Upper shelf assembly installed. Bench 1 now complete.

Image

Tomorrow's objectives: Get more TE off the floor and onto Bench 1. Assembly of the large shelving unit that was originally in the bedroom at the old place. Once that's done I should be able to get equipment placed in it's permanent location.

Re: New Lab Fit Up

Posted: Wed May 03, 2023 5:56 pm
by BU508A

Re: New Lab Fit Up

Posted: Wed May 03, 2023 11:09 pm
by 25 CPS
It looks like the setup in the new place is coming along nicely!

My sister told me years 10 years ago when I moved into this place that moving always takes longer and costs more than you expect - I hope your move and setup is bucking the trend with that!

Re: New Lab Fit Up

Posted: Thu May 04, 2023 2:15 pm
by MED6753
More done.

All the Tek TE is now off the floor. For now randomly placed on the benches/shelves for adequate room to work and prevent any further damage.

Image

The large shelving unit originally in the bedroom in the old place is now assembled.

Image

Initially I was going to get rid of the TV stand that was originally in the living room in the old place but I decided to keep it. And I'm glad I did. It fits perfectly under the window. And speaking of the window: it will NOT get curtains. At the very least a blind but that is way, way down the list of priorities.

Image

And here's a shot of the mangled Trigger Slope/Level switch on the 475A.

Image

Re: New Lab Fit Up

Posted: Thu May 04, 2023 10:00 pm
by Cubdriver
Nice right up till that very last photo - that one is painful to see. And it got well and truly fooked. Those poor knobs & controls seem to take the brunt of bumps and bangs all too often.

-Pat

Re: New Lab Fit Up

Posted: Thu May 04, 2023 11:04 pm
by mnementh
Image

mnem
don't read this.

Re: New Lab Fit Up

Posted: Fri May 05, 2023 1:35 pm
by MED6753
Not much today. After a nearly continuous week of rain the weather has finally turned nice and getting outside.

The boat anchors are now in the lab. Eventual final placement will be the 7904 and the Type 535A on a scope cart. Both carts are currently in our rental provided indoor storage unit. One Type 547 will go on bench 2. The other two Type 547's will currently remain as shown under bench 2.

Image

There is still an enormous amount left to do. The closet in the background is full of non-Tek TE as well as other items such as documents, books, tools, etc. Once they get into their final location these items in front will go into the closet. There are also other items in the beforehand mentioned storage unit for placement too.

Image

Re: New Lab Fit Up

Posted: Fri May 05, 2023 10:01 pm
by tautech
Yep try and get everything into a single room won't always work out.....looking as my pile of stock and knowing more is on the way ! <welp>
Good progress Mike. <claps>

Re: New Lab Fit Up

Posted: Tue May 09, 2023 4:37 pm
by MED6753
It's finally starting to look like a lab.

TV stand and bulk shelving unit now complete.

Image
Image

Bench 1 still in process.

Image

Bench 2 also still in process.

Image
Image

Still much to do. Nothing is wired. Will wait until all equipment is placed. One item that immediately needs to be addressed is the lighting. It's inadequate especially over bench 2. Not sure how I'll fix that just yet.

Re: New Lab Fit Up

Posted: Tue May 09, 2023 9:57 pm
by mnementh
Image

When I was setting up my bench in the GWN, 2 of these provided unbelievable quality of brilliant floodlighting, plus adjustable angle to account for dead spots and reflections.

Image

This is what held them up; cheap "socket on an cord" light fixtures hung from a hook screwed into a drywall anchor. Easy peasy.

Search terms on Amazon are pendant light fixture for the sockets (sort by price low-hi to avoid all the ridiculous millenial house-fappery) and LED Garage Lights for the bulbs. I think the ones I used were rated 6000 lumens each, but I had to pay ~$5 more from any vendor who had them to get warm white (2700-3000K) instead of daylight/bright white (5000-6000k).

Welcome back to the insanity, med!

mnem
*lit AF*

Re: New Lab Fit Up

Posted: Wed May 10, 2023 10:20 am
by MED6753
Thanks for the suggestions. I have some additional desk lamps yet to be placed which should help but I suspect I may need additional. Even during the day the room gets very little natural light. At night it's a dungeon. And of course the code doesn't require bedrooms to have an overhead light. Just a wall switch that controls at least one outlet.

Re: New Lab Fit Up

Posted: Wed May 10, 2023 4:39 pm
by mansaxel
My bench has an outdoor floodlight, 20W LED. It is adequate, but at times I'd wish it to be a bit more multi-directional, so I'll probably aim for more light sources. I'm running the light off the main contactor for the bench, so that I can kill the power for the entire bench, and put the lights out, with one quick twist of the Nockenschalter.

Re: New Lab Fit Up

Posted: Wed May 10, 2023 6:32 pm
by MED6753
Today's activity.

Finally able to get shelving fitted up in the closet. This is just half the closet. The other half still needs to be cleaned out and items placed. And yes, the top shelf is badly bowed. It was like that when we moved in. Master bedroom is the same. Result of cheap press boards and heavy items from prior tenants.

Image

Bench 2 is essentially all fitted. For now. Once the rest of the lab is complete I will be expanding this bench with additional width and shelving. This will allow me to work on boat anchors without removing all the other equipment off the bench to make room.

Image

Re: New Lab Fit Up

Posted: Thu May 11, 2023 1:23 pm
by mnementh
Image

I found the pic of my LED Garage Light setup over the bench that I was looking for the other day; this is with just one 6000 lumens-rated unit.

mnem
Image

Re: New Lab Fit Up

Posted: Fri May 12, 2023 11:14 am
by MED6753
I've decided that this will go over bench 2 after I complete the modifications.

Image